Industrial boilers, informs in beer Factory acceptance is on the boiler manufacturer production equipment, the installation of the project is up to standard of inspection, if through the acceptance, then the boiler project is over, into the later stages of boiler after-sales service. However, as for the boiler acceptance, many customers do not know the specific acceptance process and matters needing attention. Usually, the project personnel of the boiler factory of party a participate in the whole acceptance work. Let's take a look at the acceptance work of the newly built boiler.
The acceptance of newly built boilers shall be conducted by the safety inspection department of boilers and pressure vessels, and the newly built boilers shall be approved, supervised and tested for relevant performance. After passing the test, the manufacturer can formally deliver the boiler to the user.
Industrial boilers, informs in beer Factory acceptance should be paid attention to:
1. Check the construction and installation records and quality inspection records of boilers, boiler room equipment and pipelines filled in by the installation unit.
2. Check whether the installation of boilers, auxiliary equipment and pipelines meet the design requirements. Thermal equipment and road insulation, brush oil meet the requirements.
3. Check whether the installation of each safety accessory is reasonable and correct, whether the performance is reliable, and whether the pressure vessel is qualified.
4. Installation of electrical equipment in boiler room is correct, safe and reliable; Automatic control, signal system and instrument debugging qualified, sensitive and reliable.
5. Check the operation of the upper coal, combustion and slag removal system for any leakage of air and smoke; Check the effect of smoke and dust removal equipment and noise of boiler accessory equipment.
6. Check the installation quality of water treatment equipment and feed water equipment, and check whether the water quality conforms to the water quality standard of low-pressure boiler.
7. Check the debugging records of oven, boiler and safety valve, and know whether the parameters meet the design requirements during the test run.
8. Check the implementation and implementation of the provisions related to the safe operation of the boiler (such as safe evacuation, access, fire protection and safety protection).
9, after the acceptance of the overall, by the installation unit shall, in accordance with the relevant requirements, completion of technical documents, and under the custody of the construction unit, as the construction unit to the local technical supervision bureau to apply for the registration certificate of boiler using one of the supporting documents, and deposited in the industrial boilers, informs in beer Factory technical files.