Industrial steam boilers are a very wide category of special equipment currently built in boiler rooms. However, during its loading and installation, some problems must be paid attention to, otherwise it may cause a certain degree of economic loss.
1. Pay attention to the following matters during the loading, unloading and handling of industrial steam boilers: The lifting capacity of the lifting equipment should match the weight of the boiler being lifted. The lifting lugs on the boiler that cannot be used for lifting can not be used for lifting. The length of the wire rope should be reasonably selected to avoid scratching the furnace due to the inappropriate length of the wire rope. The boiler must be protected from any damage during loading and unloading.
2. Reservation of maintenance space When installing a boiler, make sure to leave enough maintenance space around the boiler.
3. Industrial steam boiler foundation and foundation installation and precautions The boiler body must be installed on a foundation 100-150mm higher than the floor of the boiler room. It must be confirmed with the technical staff of the boiler manufacturing company in advance, and construction should be carried out in accordance with the basic drawings. Embedded holes for anchor bolts must be left on the foundation. The foundation must be able to support the maximum weight of the boiler and the amount of water held. When installing the base, it must be positioned first. After positioning, adjust the two diagonal lines of the base to be the same length, and then tighten all the fixing bolts. The installation of the base is performed according to the reference line mark.
4. General precautions Be careful not to tilt or impact the boiler and its accessories too much. Do not place flammable materials around the boiler. Do not contaminate the boiler with oil and water etc. Generally, the boiler should be installed in a separate boiler room, and the new gas-fired steam boiler room should not be connected to the house. The boiler room shall not be connected to Class A or B and Class C fire hazard rooms using flammable liquids. If it is connected to other production plants, it should be separated by a firewall.
5. The fire resistance level and fire protection requirements of industrial steam boiler room buildings shall meet the requirements of the "Code for Fire Protection in Architectural Design" and "Code for Fire Protection in High-rise Civil Building Design". The floor of the gas-fired boiler room should be flat, non-flammable, free of standing water, and the bearing capacity of the foundation should meet the requirements. The power supply voltage of the gas-steam boiler room should be stable, so as not to cause the electrical components to burn out. If the voltage is unstable, it is recommended to install a voltage regulator. Ventilation equipment should be set in the boiler room, and the room temperature of the boiler should be kept below 50 °.
The above is the relevant content about the industrial steam boiler loading and installation precautions that I share for you, I hope it will be helpful to everyone.