The quick-loading gas industrial boiler is relative to the assembled boiler and the bulk boiler. The quick-loading boiler means that the manufacturer basically completes the above installation work in his own unit, and after passing the inspection and acceptance, it is transported to the installation site and hoisted to the boiler foundation. After inspection and acceptance, the pipeline and other rotating machinery (blower, induced draft fan) and dust removal and environmental protection facilities are installed, and the test operation can be carried out. The general production unit has the boiler body in stock, so the installation period is short. Products such as WNS fast-installed gas industrial boilers have higher efficiency and heat utilization rate, and have a small footprint, long service life, and low operating cost. Generally, they are preferred for quick-loading furnaces when they are small furnaces or urgently needed.
Generally speaking, a boiler from the factory to the installation and acceptance of the boiler is like this: the manufacturer is made according to the parts drawing and component drawing of the boiler drawing, and after the quality inspection at the factory, it is transported to the boiler installation site for acceptance, and then according to The assembly drawing of the boiler is assembled (main installation: boiler load-bearing frame structure, upper and lower drums, water-cooled wall tubes on both sides, economizer, superheater, safety device, etc.), and then the boiler body pressure test is passed. After that, the boiler auxiliary equipment (grate unit, coal feeding device, slag removing device, etc.) is assembled. After each unit is tested and qualified, the boiler is insulated and insulated, so that the main body of a gas industrial boiler is basically installed.